Assembly instructions

Assembly instructions Foundation Peace

The foundation must be founded at a depth of at least 300mm from the upper edge of the turf to the lower edge of the foundation. The Foundation is advantageously placed on a packed gravel bed.

After the excavation, the foundation is placed in plumb with the help of a spirit level. Backfilling takes place gradually in thin layers (max. 100mm) which are packed with a hand punch. During this work, the foundation must be checked with a spirit level so that it is plumb. This is of great importance as the foundation’s L-support make it difficult to adjust afterwards.

After the stone has been installed, backfilling must be done so that the foundation is no longer visible.

We disclaim liability for personal injury that occurs during installation.